Construction Chiller System Proffesionally

What is chiller system?

Nowadays, when it comes to air conditioning systems for high-rise buildings, offices, hospitals or industrial parks, people cannot ignore the chiller system. This is a central refrigeration equipment, which plays an important role in air conditioning, providing cool air for the entire project. Therefore, the construction of the chiller system is an extremely important stage, requiring professionalism, meticulous every stage to ensure long-term operation efficiency.
Chiller system is a central refrigeration system, usually used for air conditioning of large buildings, commercial centers, hospitals, industrial parks, etc…
thi công hệ thống chiller làm mát

The chiller system includes

  • Chiller (central air conditioner):Chiller is the central equipment of the system, which creates cold water or refrigerant solution and then circulates throughout the system to cool the air. Depending on the working principle, chiller can be divided into types such as absorption chiller, centrifugal chiller, turbine chiller,…
  • Conduit system:This is a cooling system from the chiller to the cooling points such as refrigeration units, air conditioners in the entire building. This system often uses water pipes as heat transfer solutions.
  • Circulation pump: Used to circulate the refrigerant flow in the pipeline system, pushing water throughout the refrigeration system, air conditioning for cooling.
  • Cooling tower (cooling tower): The task of the cooling tower is to cool down the hot water solution that has passed through the condenser copper cabinet pumping heat from the chiller to recirculate back to cooling.
  • The auxiliary equipment: Including valves, sensors, controllers,… to ensure the system to operate properly, safely and stably.

Operating principle of chiller system

The chiller system cools by using an absorption or compression cycle to create a refrigerant solution, which is then transmitted throughout the ducting system, cooling the air through the chillers. This is an efficient, energy-saving refrigeration solution for large buildings and is suitable for long-term air conditioning needs.
The principle of operation of the chiller system is based on the refrigeration cycle using refrigerant. Here is the detailed principle:
Steam absorption cycle:
  • The refrigerant in the chiller absorbs heat from cooling water (condensed water)
  • This absorption process causes the refrigerant to evaporate, becoming hot steam.
  • The heat is sent to the cooling tower to be cooled by ambient air.
  • After cooling, the condensed vapor returns to liquid at high pressure.
  • This fluid is pressurized by a chiller valve to produce extremely low cold temperatures.
  • This cold liquid will absorb heat from the cooling water in the evaporator starting a new cycle.
Steam compression cycle:
  • Refrigerant in compressed air increases the pressure to increase the temperature by the compressor
  • The heat passes through the condenser into the environment, condensing into a liquid.
  • Fluid passing through the pressure relief valve reduces the temperature to cold liquid
  • The cold liquid absorbs the heat in the evaporator from the cooling water, becoming hot steam.
  • This heat is sucked in by the compressor to start the next cycle.
In both cycles, cooling water acts as heat transfer and is recirculated throughout the ductwork system to cool the air for the entire building. Cooling tower helps regenerate refrigerant for the cycle to continue.
The steps in the cycle are automatically controlled by the sensor system, valves and controllers to maintain the desired cooling temperature. This operating principle helps the chiller system cool large, efficiently while saving energy.
thi công hệ thống chiller chuyên nghiệp

Construction of chiller system

Construction of the chiller system includes many important stages such as:
  1. Survey, system design
  2. Selection of suitable chiller equipment
  3. Construction of wind and water pipes
  4. Installation of chiller and auxiliary equipment
  5. Inspection, operation testing
  6. Operation and maintenance training

Survey and design of chiller system

This is the first step, which largely determines the efficiency of the entire system. Engineers will thoroughly survey the actual condition of the building such as area, number of users, location of equipment installation, etc… to accurately calculate the required capacity, select the type of chiller and rationally arrange the equipment. They also determine the placement of water pipes, wind pipes to optimize air flow circulation.

Selection of suitable chiller equipment

Based on the initial survey and calculation results, experts will choose the most suitable chiller for the actual needs of the building. There are many different types of chillers on the working principle such as absorption chiller, centrifugal chiller, turbine chiller,…..Each type has its own advantages and disadvantages in terms of capacity, refrigeration efficiency, power consumption. Choosing the right type of chiller will help the system operate optimally, saving operating costs.

Construction of wind and water pipes

After determining the location of the chiller and auxiliary equipment, the builders will embark on the construction of wind and water pipes right at the site. This is a stage that requires meticulous, high care so that the design is applied correctly. All pipes must comply with the correct size, instructions have been designed to ensure no congestion, gas loss when operating.

Installation of chiller and auxiliary equipment

Chiller is the central equipment of the whole system so the installation of chiller must be done carefully, ensuring accuracy according to the manufacturer’s instructions. In addition, auxiliary equipment such as circulating pump, evaporator, cooling tower,….. also synchronously installed in the right place and connected the pipeline.

Inspection, operation testing

After the installation of the chiller and the accompanying systems is completed, the engineers will conduct a careful inspection of the entire system before putting it into trial operation. This inspection plays an important role in detecting errors and technical errors to promptly correct. The trial operation process also contributes significantly to evaluating the performance of the entire system.

Operation and maintenance training

Finally, after completing all the technical inspection steps and putting the system into stable operation, experts from the construction unit will transfer the system to the investor and train the operation, maintenance and minor repairs for the investor’s operation team. This is a step to ensure the system can operate long, safe and effective.

Natural Star professional chiller system construction unit

To ensure a professional, safe construction process and long-term stable operation system, the selection of a reputable and experienced construction unit is extremely important. A reputable unit will ensure:
  • Team of engineers, experienced technical staff are professionally trained
  • Source of chiller equipment, genuine materials, high quality standards
  • Fully comply with the construction process in accordance with technical standards
  • Provide maintenance services, periodic maintenance
  • 24 / 7, support timely repair when there is a problem
  • Ensure absolute safety during construction and operation
  • Long-term system warranty and full legal papers
With the increasing development of modern construction works, the investment and construction of professional chiller systems will become an inevitable trend. Choose Natural Star Vina construction prestige to ensure your chiller system always works effectively and sustainably.